. . .

• Central axis renovated and reopened • Photos
  •  06/20/2021 01:49 PM

After the long suffering: At a good time over the weekend, the renovated Yarkon River Boulevard Road was reopened, a major axis through which thousands of residents make their way from the Ramat Beit Shemesh neighborhoods towards Road 10, the exit from the city in several directions. This is what he looks like tonight, watch the photos:

Read More  
Minister Litzman responded to a request from the students and the works were renewed
  •  06/02/2021 06:10 PM

After a two-year delay in the construction of the 'Psagot Ziv' project at Level 5 in the WC due to the collapse of a retaining wall in June 2019. Minister Litzman and the staff of the Ministry of Housing convened a meeting on April 26, 211. The required, and on Monday this week the works for the restoration of the wall were renewed by the Ministry of Housing, and the expectation is that within a month and a half construction will begin in the Dashmia faction to the great joy of the buyers.

Read More