. . .

The failure of reception: after years of a generator - the level C2 antenna was connected to electricity with a cable tens of meters long
  •  02/07/2024 04:00 PM

The cellular antenna operated for years on a generator with constant malfunctions • After much suffering from the residents and media pressure, it was connected to electricity:

Read More  
The reception failure continues: the antenna did not work - Ramat Beit Shemesh C2 neighborhood without reception
  •  01/15/2024 07:00 AM

The antenna placed above level C2 has been running for years on a generator with incessant malfunctions • This week the neighborhood is again without reception:

Read More